Nuclear power from Sizewell B [The white dome] and all the wind power generated off Greater Gabbard & eventually Galloper will come into the National Grid here http://www.galloperwindfarm.com/about/#location
Several huge drums of cabling arrived at FXT from Italy some two weeks ago as Break Bulk cargo, these drums were at least 10' in diam. and the weight of two on a special adapted Mafi trailer [from South Africa] went to a maximum 98 tons
The vessels were attached to the old water inlet rig tower of Sizewell A, the cabling is coming through here somewhere